Sunday, January 28, 2007

shop smart

the frame for the pedal assembly is complete. the pedal mount was annoying, as i had to buy from 3 different vendors. the ap racing, tilton, and wilwood pedals have the same dimensions for locating the master cylinders, but apparently when you buy a pedal mount from certain vendors the person making it doesn't know that. the first mount was way off. i thought i could cut and weld it together then ream out the holes, but it would have been too much work. the second mount [the vendor assured me that cleetus mounted a tilton assembly in his late model dirt car with his mount] almost fit, but i had to ream the holes out about 1/8". finally, speedway motors hooked me up with a mount that actually fit the pedal assembly without having to modify it.

here is the correct mount in the fame i welded to the meatball.


this is another shot after i welded on 16 ga sheet metal for the sides, and a bracket for the coil. note the extra box i fabricated on the left. that was needed for additional clearance for the remote cable adjuster on the balance bar. it looks good in primer. maybe i will leave it like that and put an under construction decal on it...veilside!


the top of the frame will bolt on using 4 nuts I welded to the upper rails. i wanted the top removable so i can see the balance bar and make some adjustments to it. the balance bar needs to be perpendicular to the master cylinder pushrods when the brakes are applied.

believe i watched road house 2.

Sunday, January 21, 2007

Ridin' on Toyo 22's plus 2

After a race season full of triumph and heartbreaks: DNF's, DNS, and finishes; racing with a full tank of gas and with enough gas to get through two laps; 100+ degree days and 40 degree rainy days; turkey sandwiches and "chili burgers" from the cafe; dropping the car off at 9pm in the rain or 1am in the cold; having the exhaust pass and having the exhaust be too low; Stacy in def con 1 and Stacy in def con 4; driving into the pit spot and Aaron riding in the tow vehicle to the pit spot; rain-x and no rain-x; having the crew hit the accusump switch and having the corner worker hit the switch; getting to the grid 20 minutes early and getting to the grid after the practice session started; Chester bringing the team good luck and Chester eating the P1800 replica cake; renting the Fast and the Furious and Amanda buying the Fast and the Furious so we wouldn't waste money on renting it and many more memories.......

The season ended at the banquet last night. Mike had until Jan 15th to purchase tickets - he didn't. So at 9pm Friday night the race lady called him, and Stacy went to the hotel at 4pm saturday to meet the lady when the event started at 5pm. Mike didn't let them know he would be there in time, so they didn't have his 2nd place plaque. With Stacy in Def Con 1, b/c she purchased $90 tickets to attend an event where Mike wouldn't be recognized... Mad Game - had some Mad Game skillz and turned the evening around by winning the best door prize: $800 in tires!

Sunday, January 14, 2007

where the brakes at?

time for some adjustable brake bias.


i cut out the old pedal box. it was an extremely annoying process. a plasma cutter would have been ideal, but the unibit and tin snips did the job (it looks ghetto, and believe i broke the unibit).
this is the old pedal assembly.

today i cleaned up the area where i cut out the old pedal assembly and welded in a small patch panel. then i started to weld in the frame to mount the new pedal assembly. i used 1"x 1/8" angle and beveled the edges with the grinder. then, i welded in another piece of angle to connect the fender to the firewall for additional support, as it was difficult to get the mig gun into a good position to weld the bottom of the angle iron. i welded in a 1/2"x1'8" angle as a side support. next time i will make the top and other side of the frame, and add a piece of angle to connect the fender support to the angle on the other side.

of course, i could have done this by a much easier way by plumbing in a proportioning valve into the rear brake line, but that is not how we do things at mad game racing...spend 100 x the money and 1000 x the hours to complete a project.

Monday, January 08, 2007

Bought a Rover, waited about a year and a half, and then put some plates on that b%^*h

Rover's got plates!
Phase 2 is nearing completion. We will pick it up tonight when I get home from work!

inspection jams

the rover needs some jams to pass inspection:

fergalicious - fergie
you spin me around - dead or alive
here i go again - whitesnake
imagine - john lennon

Wednesday, January 03, 2007

Rover Fails Inspection... again

1. Both front brake rotors are too thin
2. No turn down on muffer
3. Windows don't work
4. Plug suspension holes and all other holes in floor, too.
5. Evaporation canister is not connected.
6. Some of the speedometer lights are out.
7. Needs new windshield wiper blades.
8. Power steering belt needs tightened.
9. Power steering fluid needs topped off.
10. Shift selector tape doesn't line up.

Many of these things are minor and can hopefully be fixed in an afternoon. We are going to get Roche's to fix the brakes and the power steering belt. Mike, please call me on my cell phone when you get a chance- we need to talk about your weekend plans- ours have changed.
-Posted by Aaron

Tuesday, January 02, 2007

see you in a week

believe rovenasty is at roche's ready for inspection. there are a few things that could cause it to fail inspection, but we decided to risk it and see what happens.

here are some glam shots of the interior.



we bled the brakes, fixed a few random leaks, installed the seat belts, adjusted the hood, banged the dents out of the cowl, cleaned the windows, vacuumed it, and took it for a few test drives. i think towing it on the beltway was probably scarier than driving it.

check back tomorrow for the inspection results.

NEWS FLASH

Falls Church, Va. --- At approx. 5:30 pm Rove-Nasty left the Virginia junkyard where it leaked oil, transmission fluid, brake fluid, and wheel bearing grease for the past 3 months . After many many many hours of intensive labor, beer drinking, and buffoonery - the crew finally felt is was ready for the ominous MD Inspection.


"Hey Man, let's go to Roche's", Fric said as the Rover was deemed complete at 3:00pm.

His partner Frac responded, "Let's drink a Skull Splitter."

The Rover's journey was not easy, neither was getting Fric and Frac the time management skills to fix it. Here are some daunting Rover statistics regarding its completion: 15% saying hey man and drinking beer, 15% trying to fix a known problem, 70% fixing the problem that was discovered while trying to fix the known problem.

The entire team is ecstatic with the extraction of the Rover and moving it onto its true purpose – ODB Mover.

"Phase Zero is complete," says Fric's wife, "Phase one inspection, phase two me standing in line at the DMV and the final phase is parking it in front of our house and adding one more nightmare to Elm Street."

Monday, January 01, 2007

Meatball & Sonz

Hi All - guest poster Stacy here... well my dream of living in a junkyard is slowly coming true.

Check out the new cover for the Volvo... ok, ok, ok - I'll admit it doesn't look "that" bad and it will protect the meatball "if" we get some snow this year.



Unfortunately, the rusty air conditioner that was sitting at the neighbors for 8 months was finally claimed by a guy to weak to pick it up, so Mike actually had to help the guy put it in his trunk...

Rover Update: Washer to small for bolt... blah blah blah... Home Depot doesn't sell the washer size. Home Depot also doesn't have the key blank to make a copy of the Rover key. No one knows exactly how much transmission fluid the Rover takes.


the transmission lines were replaced and the batteries were installed. almost time for the inspection.